The commission was an extension and an interior reform for sale purposes.
At the beginning, the poor state of the existing construction forced an immediate strategy to consolidate the structure and the building due to large moisture defects and cracks.
A lot of reinforcement work was done to make it stable and to make it safe from moisture and termites.
Subsequently, the expansion and reform works began.